Evidence, not admin.

Capture a defect in one tap and it's in a tamper-proof record — photo, location, who, when. When it's disputed at handover, you pull up the entry, not a week of emails.

Construction, property, manufacturing, logistics, facilities. If the work is physical, it fits.

This is the record your next dispute gets settled with. See it running on one of your own jobs.

No card needed

Fast on site, solid in a dispute

Voice, offline, QR codes. Logging a defect takes seconds, so it actually happens.

1
REC“Silicone seal discontinuous at basin…”
Voice your way through markup
Pin a photo or drawing, dictate the caption. Hands stay on the work.
NO SIGNAL · BASEMENT 23 QUEUED
DEF-0424L05 · Paint chip◐ WAIT
DEF-0425L05 · Skirting gap◐ WAIT
DEF-0426L06 · Door rub◐ WAIT
Works anywhere, even offline
Basements, warehouses, remote depots. Captures sync when signal returns.
L04 · BATH 2B
Scoped to L04 · 2B3 OPEN
DEF-0421Silicone seal
DEF-0422Grout cracking
DEF-0419Tile chip
Scan to land on the right list
Stick a QR code on any location or asset. Anyone scanning lands in the right list.
Paper register · day 3
72 hawaiting contractor
DEF-0421 · closed✓ signed
4h 12m
Trade · Wet Seal Co.Sign-off · K. Hartley
Lifecycle that holds up in claims
Draft → assigned → fixed → signed off. Role-gated, fully audited.

Holds up when it matters.

Defects5 OF 42
Silicone seal discontinuousDEF-0421 · Wet Seal Co.OPEN
Conveyor guard missingDEF-0422 · MaintenanceIN PROGRESS
Power point looseDEF-0419 · ElectricalOPEN
Racking upright bentDEF-0416 · Dock 3RESOLVED
Skirting gap at cornerDEF-0412 · CarpentrySIGNED OFF
Bring every team into one register
Inspectors, managers, contractors and clients work from the same record. Invite a new contact in two taps — they’re in the loop without ever leaving your project.
AUDIT TRAIL · DEF-0421
08:12CAPTUREDK.Hartley
08:14ASSIGNEDWet Seal Co.
11:30IN PROGRESSJ.Silva
16:02RESOLVEDJ.Silva
16:04SIGNED OFFK.Hartley
Locked down after sign-off
Lock any defect record, restrict edits once it’s signed off, and keep the audit trail tamper-proof.
Field view · PRJ-221
Every defect, every photo, every sign-off — one record.
· 42 DEFECTS OPEN· 128 CLOSED · 30 DAYS· 5 TEAMS ACTIVE
CONSTRUCTION

The short version.

CAPTURE
Instant capture
Snap, tag, describe. About 12 seconds per defect.
SECURITY
Secure & sovereign
Hosted in Australia by default. Tamper-proof audit trail. ISO-aligned.
OFFLINE
Works offline
Captures queue locally. Syncs when signal returns.
HANDOVER
Handover-ready
Compliance PDFs in seconds, not hours.

Defect and quality management for everyone on the job.

A short walkthrough on one of your own jobs, then a free pilot if it fits. No card needed.

LOGISTICS